010-8205 5667 CN
RURAL TOILET REVOLUTION
2020.09.18 Services 1635

It is difficult to solve the problem of sewage discharge caused by high underground water level and narrow space. The sewage discharge point does not store sewage, does not need to be connected to electricity, the pipeline is thin, the broken road surface is less, the buried depth is shallow, and there is no lifting pump station.

image.png

image.png


Back to list